Cut and terminated the final wires for GAD J271 and installed the pins in the connector body except for the CAN bus.
Reviewed wire connections for each of the GEA 24 connections to help plan wire routing.
Removed CAN bus pins from GDU connector to allow rerouting the cable and reducing the length so it fits in the bundle better. Explored several options for bundling existing wires and decided where to install the next adele clamps.